The most realistic estimate of the time required to complete an activity is referred to as​ what?
a. slack time
b. optimistic time
c. most likely time
d. pessimistic time

Respuesta :

sydneybottom
sydneybottom sydneybottom
  • 11-01-2018
I would say B. optimistic time
Answer Link

Otras preguntas

How batteries work? What are some possible mterials you could use to make your battery?
Darren wants to substitute every occurence of the word bulky in his spreadsheet with the word strong. which of these options should he use? a. replace b. find
i want to now what equals 64 please
Which of the following is most clearly a theme in The Great Gatsby? A.Myrtle cheats on her husband. B.Tom has an affair with Myrtle. C.Immorality leads to suffe
experimental drugs used during war on american soldiers?
using the order of operations, simplify the following numerical expression: 2 4[5(3-1)]
Simplify (1/6) to the second power
King Edward I formalized baronial participation in the English government through what institution?
Cual es la diferencia entre un volcán de verdad y uno hecho casero
how to do you solve 3(2)-y=9?