contestada

If 6 men can do a piece of work in 14 days, how many men are needed to do the work in 21 days?

Respuesta :

Stochastic
Stochastic Stochastic
  • 09-10-2017
Nine men are needed.
hope this helps
Answer Link
SchoolNerd1947
SchoolNerd1947 SchoolNerd1947
  • 09-10-2017
The answer should be 9 workers due to 7 day periods.

21/7 =3
3+6 =9

Answer:9
Answer Link

Otras preguntas

Chegg A late passenger, sprinting at 8.00 m/s, is 30.0 m away from the rear end of a train when the train starts from rest with a constant acceleration of 1.00
Which of the following best describes a chord?
How does this ad transmit a cultural value? O by sharing relevant high school graduation statistics O by promoting a new type of educational program O by remind
What is the equation of the line graphed below?
I don’t know the answer. Please someone help :)
30 points help pls! Read the excerpt from "Homesick Blues." Well, I'm here now, and the reality of the situation is far removed from my expectations. The effic
Select the correct answer. Which act was passed in the late 1800s to exclude an entire ethnic group? A. Curtis Act B. c. Townshend Act Chinese Exclusion Act D.
15. Determine the zeros for and the end behavior of f(x) = x(x - 4)(x + 2)
How much would you have to invest today in the bank at an interest rate of 10% to have an annuity of $5600 per year for 7 years, with nothing left in the bank a
According to the WHO, what percentage of all infectious disease is caused by parasites?