why do pre construction and design specialists typically take an interdisciplinary to their work

Respuesta :

Erudite1
Erudite1 Erudite1
  • 14-07-2017
Pre-construction activities involves planning, coordinating and control of a project from the very beginning to the end of the project in order to produce to produce a financially viable project. Construction and design specialists typically take an interdisciplinary approach to their work in order to draw on a varied creative tool set. 
Answer Link

Otras preguntas

the measures of the angles XYZ are in the ratio 4 5 6 what are the measures of the angles
What process does eukaryotic cells produce through
A 10% increase in cigarette prices has been found to result in a _____ decrease of smokers.
what is a sister discipline of history
Trey's family has been walking together for 20 minutes at least three days per week for the past four weeks. They already have so much more energy, and they wan
A Cart at the top of a 300m hill has a mass of 40kg. what is the carts gravitational potential energy?
True or false Fears of malpractice lawsuits are playing a part in the increased use of expensive diagnostic equipment.
If x is a number that is 7 more than y, how do you express x as a function of y?
Why is pacing important in a text?
Draw a rectangle with an area of 8 square centimeter