khatri591111
khatri591111 khatri591111
  • 09-01-2022
  • Mathematics
contestada

10 workers can paint a building in 21 days. If work has to be finished in 15 days, how many extra workers are required?

Respuesta :

kmbtoh12
kmbtoh12 kmbtoh12
  • 02-06-2022

Answer:

20 sorry if I'm wrong

Step-by-step explanation:

because you increase in workers and decrease in days so i think it's 20

Answer Link

Otras preguntas

one of the assistants ____ on vacation. which verb form correctly completes the sentence. A )is being B) be C) are D )is
At 1 atm, equal masses of H₂O(s), H₂O(l), and H₂O(g) have(1) The same density(2) The same distance between molecules(3) Different volumes(4) Different Percent c
How many grams of NaOH are required to prepare 240 mL of a 3.50 M NaOH solution?
The function d(x) = 3x + 2 determines how many donuts need to be purchased for a meeting, where x is the number of people at the meeting. The office manager use
If xy<82 and y is a positive multiple of 3, what is the greatest possible integer value of x ?
Which pole of a compass needle points to a south pole of a magnet??
Select the items associated with World War II. 1 Triple Entente and Triple Alliance 2 ended with the fall of the Berlin Wall 3 ended November 11, 1918
You are helping the school nurse decide which students are most at risk for health problems. Look at these four cases. Which person seems most likely to abuse
In an average ecosystem, about how much energy is present in the organisms at a given trophic level compared to the organisms at the next higher trophic level?
Geography is a huge and varied field, but all of it is related to: