drakester2004 drakester2004
  • 06-09-2021
  • Engineering
contestada

Deviations from the engineering drawing cannot be made without the approval of the
A. contractor
B. architect
C. engineer
.D. foreman

Respuesta :

manamoto13 manamoto13
  • 06-09-2021

Answer:

a. contractor

Explanation:

The contractor has to approve or give the sign for the drawings to be made, otherwise you can't do anything.

Answer Link
teddiarsa
teddiarsa teddiarsa
  • 06-09-2021

Answer:

it's option a. contractor

Explanation:

did the same quiz

Answer Link

Otras preguntas

The UK produces most of its electricity from fossil fuels. Many people in the UK leave their televisions in ‘stand by' mode when not in use, instead of switchin
There are 16 females and 20 males at the park. Which of the following represents the probability of randomly selecting a male to participate in your kickball ga
Argue the difference between what makes something valuable and what makes something a treasure.
Toby the poodle buries 9 sticks. Clifford the jack russel buries 7 times as the amount of sticks toby How many sticks did the dogs bury in all
Help me please quickly
what is an expression showing the sum of 5 less than the number k
Please help with math
Please help or else donkey from Shrek will eat all your pancakes!
Chasidy and Shelby went to the candy store. Chasidy bought 5 pieces of fudge and 3 pieces bubble gum for a total of $5.25. Shelby bought 2 pieces of fudge and 3
Things that grow in a region that can be used to help or support a group of 1 point people are Resources Groundwater Famine BI hp