katlynnchandler katlynnchandler
  • 08-07-2021
  • Mathematics
contestada

It takes 5 hr for 2 bricklayers to build a park wall. How long would it take 8 bricklayers to complete the job?

Respuesta :

tyrapipkin00 tyrapipkin00
  • 08-07-2021
1 hour and 25 mins
It takes 1 hour and 25 mins to complete the 8 bricklayers job
Answer Link

Otras preguntas

The remain of which organism are most likely to leave a fossil
Every cereal box has a gift inside, but you cannot tell from the outside what the gift is. The store manager assures you that 11 of the 54 boxes on the shelf ha
According to Hobbes, why do humans participate in a social contract
Why is aggression a negative quality to bring to a sport?
An experiment was conducted, and it was determined that plants that received more than two hours of sunlight per day grew larger than plants that received less
Which model is most likely used to show something that happens too slowly to see?a model of a weather systema model of mountain formationa model of the area of
Everett McCook, age 42 lives in Territory 3. Each day he drives 5 miles each way to the college where he teaches. His liability insurance includes $50,000 for s
If the measure of a tangent chord angle is 68 degrees then what is the measure of the intercepted arc inside the angle
causes the particles of a substance it passes through to be alternately squeezed together and pushed apart. W ill travel through a solid, a liquid, or a gas
10. Solve. 16 +2° + 12-32​