lkobahadurkarki038
lkobahadurkarki038 lkobahadurkarki038
  • 08-05-2021
  • Mathematics
contestada

if 12 men complete a piece of work in 10 days in how many days would 15 men complete the same work​

Respuesta :

Brobertiello Brobertiello
  • 08-05-2021
12 men = (1/10) work per day

15 men = (1/8) work per day

So 8 days
Answer Link
Joshika22
Joshika22 Joshika22
  • 08-05-2021

Step-by-step explanation:

number of men =12

time taken = 10 days

time taken to complete the work by 15 men = 12÷10=1.2

= 1.2 ×15 = 18

therefore, 18 days is taken to complete the work by 15 men

Answer Link

Otras preguntas

Which source would provide the most reliable information about the safety of nuclear power plants?
The human stomach secretes an enzyme known as pepsin. This enzyme breaks down proteins into smaller chemical molecules called peptides. If pepsin was mixed in
sketch the graph of each linear inequality y>-2x-2
Write three reasons to go along with the claim: " Education systems are destroying childrens’ passions for the arts."
Stephen Douglas was a Democratic Party leader who supported 1.free labor. 2.popular sovereignty. 3.racial equality. 4.abolitionism
What is 1/10 of 2325
Because the animal shelter was filled with dogs and cats the noise in the building was incredibly loud. what is the subject in this sentence? A. dogs and cats
6 and p - 6 in standard form
2. (-5+ 6n to the 3rd power) + (1- 2n to the 2nd power)
1/3+1/4 using simplest form