John Jacobson entered into a contract with Spring Water Drilling, Corp to drill and install a spring well system that would produce a specified quantity of water each month. After the system was installed, it was unable to meet the water volume production level specified in the contract. Jacobson has initiated a lawsuit against Spring Water. Would this dispute be resolved using the Uniform Commercial Code?