elijahmartin91
elijahmartin91 elijahmartin91
  • 09-04-2020
  • Physics
contestada

A 30kg bucket of water is lifted vertically 3.0m. How much work was done on the bucket during this movement

Respuesta :

angelm618628
angelm618628 angelm618628
  • 09-04-2020

Answer:

Explanation:HELPPPPPPP

Ver imagen angelm618628
Answer Link
barcadna15
barcadna15 barcadna15
  • 09-04-2020

Answer:900joules

Explanation:

mass=30kg

Height=3m

g=10m/s^2

Work=mass x g x height

Work=30 x 10 x 3

Work=900joules

Answer Link

Otras preguntas

How are burning and rusting similar?
How do u spell (taco cat) spelt backwards
Mean score is 7.25 in eight categories what is the total score
A store sells two different types of coffee beans; the more expensive one sells for $8 per pound, and the cheaper one sells for $4 per pound. The beans are mixe
Although the monsoons may bring severe storms, they are considered necessary in India. Why?
Presidential candidate Abraham Lincoln had just won election or presidential candidate, Abraham Lincoln, had just won election
Parallelograms are always squares. true or false pretty please answer
The pros and cons of the changes people have made to the land in south Florida
whats important about the points?
6.52 or 6.520 which is greater