A selective outline of the project that ensures the identification of all tasks and an understanding of what is to be done is called a(n) ____________.

Respuesta :

Supabrain Supabrain
  • 10-03-2020

Answer:

Work breakdown structure

Explanation:

Answer Link

Otras preguntas

When Stalin’s eventual successor, Nikita Khrushchev, came to power in the Soviet Union, many Americans initially hoped that he would permit political reform. Th
what was the effect of mountains and oceans on the history of India?
Maths Share £72 in the ratio 2:7
dialogue between two soldiers discussing hard times in valley forge
When 8 is subtracted from Ollie’s age, the result is the same as subtracting 16 from 3 times his age. How old is Ollie? years
Which of the following was a feature of Athenian democracy during the 5th century B.C.? All citizens had the same wealth and social status. The number of votes
help me plz :) why would it be unwise to skip the cool down stage??
What led most directly to the establishment of the provisional government?
baker made 5 pounds of icing. He used 4/9 of the icing to decorate. How much did he have left over?
Name three strengths of the British military