williamsjasmine williamsjasmine
  • 10-05-2016
  • Mathematics
contestada

If 4 people can stain a deck in 2 days, how many people would be required to stain the deck in only 1 day?

Respuesta :

juju3911
juju3911 juju3911
  • 10-05-2016
8 people could stain a deck in one day.
Answer Link
littlemojo101
littlemojo101 littlemojo101
  • 10-05-2016
the answer to this is 8
Answer Link

Otras preguntas

why do we get headakes
True or false??1. volcanoes can carve landforms, such as lakes and valleys, in a matter of hours.2. The Hawaiian Islands were formed by volcanoes located at a p
how do you solve 3x-2 divided by 8=x/4-1 ?the answer is x= -6but how do you solve it?
how were the slaves owned by africans treated differently from the slaves owned by europeans?"eyewitnes: oluadah equiano an african boy?
how do you solve x^2+11x+18=0 with either quadratic formula. factoring. or squarerooting
A graph includes the ordered pair (2, 4). Write two different rules that would be possible for this graph. Explain how you found your answer
what is the answer of 0.05, 1/8, 0.2, 1/4, 3% from least to greatest
I have a question on my summer packet. Find 33% of 90
What are some of Martin Luther's hobbies?
what does perpendicular mean