stariou7719 stariou7719
  • 08-08-2019
  • Mathematics
contestada

In a push manufacturing system, raw materials are released to production based on forecasted demand.

True

False

Respuesta :

wagonbelleville wagonbelleville
  • 13-08-2019

Answer:

TRUE

Step-by-step explanation:

the correct answer is True.

In push manufacturing system decision is based of  huge manufacturing is

done by long term forecasting the raw material are released for production

based on the demands.

In push manufacturing the inventory are very high and wastage  is also high.

In push manufacturing system generally opted when the project is very huge.

Answer Link

Otras preguntas

The number of cubic feet of water in a curved container can be approximated by V = 0.95h2.9. Find the amount of water in the container when h = 8 feet. Round to
PLEASE HELP ME!!!!!!!! PART 2 10 POINTS!!!!1
an investigation is currently worth 1.2 X10^7 dollars twenty years ago the investment was worth 9.6X10^5 dollars how many times greater in the value of the inve
find the equation of the line: slope 3, passes through the origin
How do I do 1-2? Do I use graph paper?
You have 19 digs for your current volleyball season. There are 5 games left in the season. You want to break your previous record of 26 digs in a season. Write
Help me pls fast ASAP
Do you think these systems are fair why or why not?
i need help please help me
I don’t understand this, please help