holyy holyy
  • 09-04-2019
  • History
contestada

how many cubic yard of rock were removed​

Respuesta :

Аноним Аноним
  • 12-04-2019

Answer:

10 890 000 cubic feet / (27 cubic feet per cubic yard) = 40 333 cubic yards. That's how much dirt you would be excavating and moving. You will have to determine how much effort goes into the job in order to determine an appropriate price.

HOPE THIS HELPED!!!! XD

Answer Link

Otras preguntas

How did the Progressive Movement change the United States, and what might bedifferent today, had it not taken place?
Does mariachi music have a very sad and slow beat to listen to
How do you suppose the threat of being hanged?
One type of evidence that supports Wegener’s continental drift hypothesis is the existence of _____. mountain belts that begin on one continent and continue on
does the ear drum vibrates when struck by sound waves and directly sends a message to the brain that is then recognized as sound?
The GRE is an entrance exam that most students are required to take upon entering graduate school. In 2014, the combined scores for the Verbal and Quantitative
a carpenter worked for four days to finish a repair job she charged $825 for 15 hours plus $270 for materials what is the Carpenters rate per hour
How do you find the acceleration of an object?
About _____ of school-age children live in a two-parent family.
Which of the following motivated the United States to support the Bay of Pigs invasion? A. It hoped to break Cuba's blockade of American ports. B. It hop