safwanaftab17 safwanaftab17
  • 07-03-2019
  • Mathematics
contestada

Square slabs of side 40cm are to be paved in the rectangular courtyard of an office 24m
long and 16m wide.Find the number of slabs required?

Respuesta :

guadalupebelenperez guadalupebelenperez
  • 07-03-2019

Answer:

first you find the area.

16 * 24

aea of the courtyard is 384 meters

there is 100 cm in a meter

100 cm  by 40 cm (the size of the slab)

you get 2.5 slabs per meter then you multiply by the total meters of the courtyard

2.4 * 384 = 960

you need 960 slabs

Step-by-step explanation:

Answer Link
saja34 saja34
  • 07-03-2019
Its a theory about space
Answer Link

Otras preguntas

What is the answer to -10+x+4-5=7x-5
Is this a function?
(URGENT) Gertrude and Russell are traveling on their motor scooters in the same direction along the same road. Gertrude is traveling at 10 mph and is exactly 3
You are writing a research paper on careers in the fashion industry. Which source would be the MOST credible for you to use in your paper?
If a business is in need of working capital, one option is to use a(n) ________ that will buy the company's account receivables and then handle their collection
does anyone know the answer for the problem below
The instructions on a bottle of laundry detergent tell you to add two capfuls of detergent to each gallon of water. One capful of detergent is equal to about on
If 14 meters of ribbon cost $19, how much would 21 meters of ribbon cost? NEED HELP ASAP
According to historians, in which city did the Renaissance start in?
Multipli lui 6 cuprinsi intre 11 si 39 sunt