The shortest possible time an activity can be completed realistically is called ___________ time.

Respuesta :

MrsTriplet MrsTriplet
  • 22-05-2018
The shortest possible time an activity can be completed realistically is called crash time. In project management crash time is a method that is used to shorten the length of a project. To do this, the team will decided on a crucial part of the project they can complete in less time than normal. This speeds up the projects completion time and allows for more work to be completed. 
Answer Link

Otras preguntas

The local drugstore is offering 15% off the normal price for a 16-pack of AAA batteries. If a 16-pack of AAA batteries is normally $9.99, what would be the sale
What's the total area of a covered box with a length of 4 ft, a width of 3 ft, and a height of 6 ft?
sketch a model to show how to combine the following fractions: 4/3 + 2/3 =
how are energy and temperature related​
When was the 23rd Amendment passed? Why was it passed into law? Give 2 interesting facts that are a result of the 23rd Amendment.
Why were the French and British troops relieved when the Americans arrived in the western front?
what Expression is equivalent to 8x+12
6 points for a English questions ASAP plz!!!
answers pls for chapter 25 and 26 review for geo for tomorrow's test pls so I can study it​
1/4 = 3/5s what is the solution