chrisfcarpenter12319 chrisfcarpenter12319
  • 09-05-2024
  • Business
contestada

Labor wages are a variable cost, a manufacturing, and a product cost. Raw materials are a variable cost, a nonmanufacturing, and a product cost. Infrastructure/ building lease is a fixed cost, a manufacturing, and a period cost.

Respuesta :

Otras preguntas

At sea level, water boils at 100 degrees celcius and methane  boiled at -161 degrees celcius. Which of these substances has a stronger force of attraction betwe
what are two possible uses of genetic engineering
what are two possible uses of genetic engineering
What is the volume of a sphere when r = 9 ft
What is the volume of a sphere when r = 9 ft
At sea level, water boils at 100 degrees celcius and methane  boiled at -161 degrees celcius. Which of these substances has a stronger force of attraction betwe
What is the volume of a sphere when r = 9 ft
What is the volume of a sphere when r = 9 ft
what is a quote from the odyssey that shows odysseus' religion
what are two possible uses of genetic engineering