Shutupvitxh6220 Shutupvitxh6220
  • 10-04-2024
  • Business
contestada

P and Q working together can complete a job in 48 days. The ratio of their rates of doing work is 3:5. Find the time taken by the faster person to complete the job. (in days).

Respuesta :

Otras preguntas

achemisrty instructor provides each student with 8 test tubes at the beginning of the year if there are 28 students per class,how many test tubes are required f
Ms. Carlson has $7,145.Ms.lee has $3.799 A. Who has more money? B. estimate the total amount of money they have
I need help solving this problems?
how did the domestication of animals help people?
a school is selling T- shirts to students. it costs $35 to create the design and $10 to print each shirt. write an equation in y=mx+b that models this.
find the slope of f(x)=x^3-2x^2-1 at the point (2,-1). then write the equation of the tangent line at the point (2,-1). show all work
consider the line L with equation y+2x=3. The line L(sub 1) is parallel to L and passes through the point (6,-4). A) find the gradient of L(sub 1). B) Find the
what it means perpendicular bisector
two angles form a linear pair. the measure of one angle is 1/4 the measure of the other angle. find the measure of each angle
what is (c+1) +9 in simplified form plz help