sandyyknguyen1334 sandyyknguyen1334
  • 10-01-2024
  • Engineering
contestada

A civil engineer involved in construction requires 4800, 5800, and 5700 m² of sand, fine gravel, and coarse gravel, respectively, for a building project. What's the total volume of materials required in cubic meters?
A) 16300 m²
B) 16300 m³
C) 163 m²
D) 163 m³

Respuesta :

Otras preguntas

what two things increase the gravitational pull between two objects?
Summarize the motion of particles in solids liquid and gases
why is it difficult to collect evidence about the sky
does neighbors have a apostrophe
What does -9.8 m/s mean? And what does it mean if something has a negative velocity?
Which approach do you think is more effective in fighting discrimination self improvement or the courts ? Explain .
A cube has a volume of 1000 cubic feet. What us the edge length of the cube?
what is the slope intercept form of 3x=9y?
A ramp to a building has a height of 4 feet and the angle of elevation is 33 defrees. How long is the ramp?
Since it's founding, a volunteer group has restored 50 houses. It plans to restore 15 houses per year in the future. Write an equation that models the total num